Row of Belgian townhouse facades in evening light
Certified asbestos expert

Clear advice for an asbestos-safe environment.

Certified certificates and inventories for Flanders, Brussels and Wallonia. Carried out in line with the legislation, with no surprises afterwards.

  • Fixed price up front
  • Usually within the week
  • Accredited lab for samples
How it works

From request to certificate.

Four steps. You know in advance who comes, how long it takes and what it costs.

01/ 04
  1. 01

    You request a quote

    Online or by phone. You get one fixed price within 24 hours.

  2. 02

    We schedule the visit

    You pick a time. We are usually on site within the week.

  3. 03

    We come on site

    One to three hours on site. Every suspect material is assessed.

  4. 04

    You receive your document

    The OVAM certificate, or the inventory report in the required format.

Where it sits

Six places, one house.

Click a number. These are the places where we most often find asbestos in a building from before 2001.

1 2 3 4 5 6
Weathered fibre cement corrugated sheets
1 Roof Corrugated sheets and slates

Fibre cement corrugated sheets or slates on the main roof. Bonded, but brittle once the material weathers.

The calendar

The dates that matter.

The certificate obligation is being widened step by step. Early is calmer than late.

  1. 1998

    Ban

    Belgium bans the production and use of asbestos. Buildings from after that date should no longer contain it.

  2. 2022

    Certificate when selling

    From 23 November an asbestos certificate is required when selling any building built before 2001.

  3. 2032

    Every owner

    Even without a sale, every owner of a building built before 2001 must hold an asbestos certificate.

  4. 2040

    Asbestos-safe

    Flanders aims to have all high-risk asbestos applications removed by then.

24 hUntil your fixed price is in your inbox
2001Year of construction that triggers the obligation
10 yearsStandard validity of a certificate
3 regionsFlanders, Brussels and Wallonia, one contact

Full legislation and deadlines

Frequently asked questions

Answered briefly.

When selling or transferring a building built before 2001, from 20 m² onwards. By 2032 every owner of such a building must have one.

Ten years. Five years if high-risk materials are present, and indefinitely if no asbestos is found.

That depends on the type of building, the floor area and the number of samples. You get one fixed amount within 24 hours, with no surprises afterwards.

A non-destructive inventory opens nothing up. A small sample is sometimes needed; we agree on that beforehand and leave the spot tidy.

Usually nothing needs to happen. Bonded material in good condition may stay where it is. Only damaged or friable material gets urgent advice.

Usually within the week. If your sale agreement is signed or your works start soon, mention it in your request.

More about asbestos and why it is dangerous

Know the price within 24 hours.

The form takes two minutes. You get one fixed price, with no obligation.

Call Quote